Texas · Water & Wastewater Utilities
Texas just bet $20 billion on water. Your capital plan decides whether it lands.
A supply-demand gap widening toward a drought-of-record shortfall, pipes that lose enough water every year to supply five major cities, and the largest state water investment in a generation arriving all at once. For a Texas utility CFO or capital lead, every one of those forces reshuffles the projects on your list. Invizion helps Texas utilities re-sequence a capital portfolio in a click — and defend every decision.
The Texas Landscape
Four forces are moving your project list at once
None of these is theoretical, and none of them waits for your next budget cycle. Together they mean the capital plan you approved last year may already be the wrong plan.
Supply — Drought & Aquifers
A supply-demand gap that keeps widening
The State Water Plan projects that statewide demand climbs from about 17.7 million acre-feet in 2020 to 19.2 million by 2070, while existing supplies fall roughly 18% to 13.8 million acre-feet. Without new strategies, about one-quarter of Texans could face municipal water shortages in a drought of record.5
The pressure is already local. San Antonio’s region hit Stage 4 Edwards Aquifer pumping restrictions in 2025,6 and on the High Plains the Ogallala is being drawn down far faster than it recharges — a structural threat to Panhandle communities and their utilities.7 Where your next acre-foot comes from is now a capital question, not just a resource one.
Demand — Growth
The nation’s fastest-growing state, again
Texas led every other state in numeric population growth in 2024, adding hundreds of thousands of residents in a single year.8 The metros absorbing that growth — Houston, DFW, Austin, San Antonio — are the same systems already stretched on supply.
Every new service connection is a capacity commitment. Growth-driven capital competes for the same dollars as renewal and compliance, and the sequencing between them is exactly what boards fight over.
Renewal — Aging & Resilience
Old pipe, big leaks, and a winter that exposed it
Texas water systems lose at least 572,000 acre-feet a year — roughly 51 gallons per connection every day — through leaks and breaks.3 In 2024 the City of Austin alone leaked about 9.3 billion gallons.9 The 2021 winter storm put as many as 8.7 million Texans under boil-water notices when systems lost power and pressure.10
Renewal isn’t optional: the state carries roughly $74 billion in 20-year drinking-water repair needs and another $21 billion for wastewater.1 New obligations stack on top of that backlog — they don’t replace it.
Compliance — PFAS & Lead
New federal mandates, on the same clock
Under EPA’s 2024 rule, PFOA and PFOS are limited to 4 parts per trillion, and roughly 50 Texas public water systems have already reported exceeding at least one of the new limits. Utilities must complete monitoring and treat to compliance by 2029.11
On top of PFAS, TCEQ — which holds Safe Drinking Water Act primacy in Texas — is driving lead service line inventories and replacement.12 These are funded mandates with fixed deadlines, and something on the list has to move to meet them.
Who Runs Texas’s Water
Big municipals, a long tail of small systems, and a growing private sector
Texas’s largest metros run their own water and wastewater utilities, set rates through city councils and boards, and dominate by volume. Below them sit thousands of small and rural systems, districts and a consolidating group of investor-owned providers regulated by the PUC. The pressures are shared; the accountability path differs.
Municipal & public utilities
Rates set by city council · capital approved by governing boards
Municipals set their own rates, but every dollar is approved in public, in front of ratepayers.
Investor-owned & small systems
Rates & capital recovery regulated by the PUC of Texas
Consolidation is accelerating — the PUC reviews investor-owned acquisitions such as The Texas Water Company’s 2024 move to acquire 3009 Water Company.17
Rate-Setting & Oversight
Every capital dollar has to be defensible
Texas splits oversight across three agencies plus local boards. Whoever you answer to, the question is the same: why this project, why now, why at this cost?
- TCEQ holds Safe Drinking Water Act primacy for roughly 7,000 public water systems — setting the compliance capital agenda for PFAS, lead service lines and system reliability.412
- Public Utility Commission of Texas (PUC) regulates rates, capital recovery and Certificates of Convenience & Necessity (CCNs) for investor-owned water and sewer utilities.18
- Texas Water Development Board (TWDB) writes the State Water Plan and administers the state’s low-interest financing — the body a utility’s capital plan ultimately has to satisfy to draw funds.5
- City councils & utility boards set rates and approve capital for the big municipals — SAWS, Houston, Dallas, Austin, El Paso — in open, ratepayer-facing meetings.
Funding On The Table
The money is moving — can your plan absorb it?
Texas utilities have more capital funding available than they’ve had in a generation. The constraint is no longer only dollars — it’s readiness: which projects are shovel-ready, which qualify, and how the timing lines up with everything else on the list.
- State Revolving Funds — ~$505M drinking water + ~$583M clean water could be made available for SFY 2026 through the TWDB, including roughly $198.5M and $112.6M in IIJA supplemental capitalization.1920
- Proposition 4 (2025) — up to $1B/yr in dedicated sales-tax revenue flows to the Texas Water Fund from 2027 through 2047, roughly $20 billion in all.2
- Proposition 6 (2023) — $1B Texas Water Fund seeded the effort, with at least $250M carved out for the New Water Supply for Texas Fund (desalination, produced water, aquifer storage).21
- EPA WIFIA loans are landing for Texas systems — including a $156M loan to Pflugerville and a $17M loan to Sharyland Water Supply Corporation.22
- USDA Rural Development continues to fund small-town systems — over $45M in a single recent round of rural Texas water and wastewater projects.23
Where Invizion Fits
Turn a moving Texas picture into a defensible capital plan
Invizion is scenario-based capital portfolio optimization built for water utilities. When the supply picture shifts, a mandate lands, or a grant comes through, you don't re-plan by hand for weeks — you model it and decide with a record you can stand behind.
Model the “what-if” before it's forced on you
A new mandate, a failed main, a grant with a deadline — build the scenario and see the impact on the whole portfolio, side by side with today's plan.
Re-sequence 500 projects in a click
When priorities move, Invizion re-orders the portfolio automatically — accelerating, stretching, or deferring projects against the constraints you set, not weeks of spreadsheet surgery.
Give regulators or your board a defensible record
Every prioritization and trade-off is captured. When you're asked “why this project, why now,” the answer is documented — not reconstructed after the fact.
Texas Water, In Brief
Questions Texas utility leaders are asking
Short, sourced answers — the same facts we’ll dig into on a call, in the context of your system.
How much is Texas investing in water through Proposition 4?
How much water does Texas lose to aging pipes?
Who regulates water utility rates in Texas?
What are Texas’s State Revolving Fund levels for 2026?
What PFAS rules do Texas water utilities face?
How does Invizion help Texas water utilities plan capital programs?
Go Deeper
Related from Invizion
Start The Conversation
See what a defensible capital plan looks like
Book a 20-minute first meeting. We'll talk through the forces reshaping your capital program and show how Invizion helps you keep the plan current and defensible — no slides, no pressure.
Book your first meetingThis briefing was last reviewed September 2026.
Sources
- Texas 2036, “Texas’ Water Infrastructure Funding Needs” — ~$154B total need; ~$73.7B drinking-water and ~$21.1B wastewater 20-year repair; $112B funding gap, 2023–2025. texas2036.org
- Texas Water Foundation, “Voters Approve Prop 4 — Dedicating $20B to Water Infrastructure” — up to $1B/yr of sales tax to the Texas Water Fund, 2027–2047, November 2025. texaswater.org
- The Texas Tribune, “What to know about Texas’ looming water crisis” — systems lose at least 572,000 acre-feet/yr (~51 gal per connection/day), March 2025. texastribune.org
- Government Technology, citing EPA/TCEQ — Texas has ~7,000 regulated public water systems; 310+ with unaddressed quality problems. govtech.com
- Texas Comptroller, Fiscal Notes (citing the State Water Plan) — demand rises to 19.2M AF and existing supply falls to 13.8M AF by 2070; ~one-quarter of Texans face municipal shortages in a drought of record, September 2023. comptroller.texas.gov
- Texas Public Radio, “Stage 4 aquifer pumping restrictions declared for San Antonio area” — Edwards Aquifer drought restrictions, August 2025. tpr.org
- Stateline, “Agriculture built these High Plains towns. Now, it might run them dry” — Ogallala Aquifer depletion in the Texas Panhandle/High Plains, January 2024. stateline.org
- Houston Chronicle, citing U.S. Census Bureau — Texas led the nation in numeric population growth again in 2024. houstonchronicle.com
- KXAN Austin, “City of Austin pipes leaked 9.3 billion gallons in 2024.” kxan.com
- NPR, Winter Storm Uri live updates — 8.7 million Texans under boil-water notices, February 2021. npr.org
- Texas Public Radio / The Texas Tribune, “Dozens of Texas water systems exceed new federal limits on ‘forever chemicals’” — ~50 systems; 4 ppt PFOA/PFOS; compliance by 2029, April 2024. tpr.org
- Texas Commission on Environmental Quality (TCEQ), “PFAS in Drinking Water” — Safe Drinking Water Act primacy, PFAS monitoring, lead service line inventory. tceq.texas.gov
- San Antonio Water System, “About SAWS” — ~2M people served; 511,300 water and 457,600 wastewater customers. saws.org
- Houston Public Works, “About” — serves 2.3M+ residents across 671 square miles. houstonpublicworks.org
- Dallas Water Utilities — 1.2M+ retail customers, 31 wholesale customers, 4,600+ miles of water main. dallascityhall.com
- El Paso Water, Kay Bailey Hutchison Desalination Plant fact sheet — 27.5 MGD, world’s largest inland desalination plant. epwater.org
- Herald-Zeitung / SJW Group — SJWTX (The Texas Water Company): ~78,000 customers, 26,000+ connections, $150M+ invested; 2024 filing to acquire 3009 Water Company. herald-zeitung.com
- Public Utility Commission of Texas, “Faucet Facts — Certificates of Convenience & Necessity” — PUC regulates rates and CCNs for investor-owned water and sewer utilities. puc.texas.gov
- Texas Water Development Board, Drinking Water SRF SFY 2026 Intended Use Plan — ~$505.5M available, incl. ~$198.5M IIJA general supplemental. twdb.texas.gov
- Texas Water Development Board, Clean Water SRF SFY 2026 Intended Use Plan — ~$583.0M available, incl. ~$112.6M IIJA supplemental. twdb.texas.gov
- Underground Infrastructure / TWDB — Proposition 6 (2023) created the $1B Texas Water Fund and a $250M New Water Supply for Texas Fund (desalination, produced water, aquifer storage). undergroundinfrastructure.com
- U.S. EPA — WIFIA loans to Texas: $156M to Pflugerville and $17M to Sharyland Water Supply Corporation. epa.gov (Pflugerville) · epa.gov (Sharyland)
- USDA Rural Development, “USDA Announces Over $45 Million for Infrastructure Projects in Rural Texas” — water and wastewater loans and grants. rd.usda.gov
