South Carolina · Electric & Grid Utilities
South Carolina is building $5 billion of new gas while still paying for a reactor that never ran.
Gigawatt-scale data centers and new manufacturing are stacking load onto a grid that is retiring coal, restarting V.C. Summer, and carrying billions in stranded nuclear debt. Every one of those forces reshuffles the projects on your list. Invizion helps electric utilities re-sequence a capital portfolio in a click — and defend every decision.
The South Carolina Landscape
Four forces are moving your project list at once
None of these is theoretical, and none waits for your next budget cycle. Together they mean the capital plan you approved last year may already be the wrong plan.
Demand — Load Growth
Gigawatts of new load, arriving fast
A single proposed data center near Walterboro would draw about 1,000 MW — roughly Santee Cooper's entire share of the planned Canadys gas plant — against existing Google and Meta centers that each use around 200 MW.1
Duke's Carolinas data-center pipeline has swung from more than 100 requests to under five, but if the survivors land it could reach nearly 5,000 MW — about 10% of Duke's output — and Dominion still counts nine potential centers.5 Every large new customer is a capacity commitment competing for the same capital.
Reliability — Adequacy
Nuclear-heavy today, thinner margins tomorrow
Nuclear is South Carolina's single largest source of electricity, and the state generated about 100.5 million MWh in 2024 on roughly 24,700 MW of summer capacity.6
But coal is retiring and load is climbing at the same time, so the reliability margin now depends on new gas and nuclear projects landing on schedule — which is exactly why utilities are committing billions to Canadys and other builds.2
Generation — The Transition
Coal out, gas and nuclear back in
The 2025 Energy Security Act (H.3309) cleared the way for new gas and faster siting.7 Dominion and Santee Cooper are building the 2,200 MW, ~$5 billion Canadys plant with a $431 million pipeline, and Duke is proposing a 1,400 MW, $3.2 billion plant near Anderson targeted for 2031.2
Santee Cooper is retiring the Winyah coal plant within the decade and converting Georgetown to gas.8 Meanwhile the abandoned V.C. Summer reactors may restart under a Brookfield deal, with Santee Cooper keeping up to 25% ownership.9
Capital — Grid & Legacy Debt
Fund the build-out while the old debt is still on the books
Utilities are financing new plants and the transmission to connect gigawatt loads at the same moment they carry the V.C. Summer legacy — about $9 billion spent on reactors that never ran.3
Dominion is asking regulators for a $332 million revenue increase at a 10.5% ROE, and Santee Cooper has authorized up to $700 million in new debt for gas projects.48 New obligations don't replace the backlog. They stack on top of it, and something on the list has to move.
Who Runs South Carolina's Grid
Two big IOUs, a state-owned utility, and a large co-op system
South Carolina's grid is carried by PSC-regulated investor-owned utilities, the state-owned Santee Cooper, and the electric cooperatives that buy through Central. The pressures are shared; the accountability path differs.
Investor-owned utilities
Rates & capital recovery regulated by the SC PSC
Dominion (formerly SCE&G) became a Dominion Energy company after Dominion acquired SCANA in 2018 for $14.6 billion in the wake of V.C. Summer.11
Public power & cooperatives
State-owned board & member-governed, not PSC rates
A Brookfield restart deal would pay Santee Cooper $2.7 billion, cutting roughly $2.6 billion of V.C. Summer debt off customer bills.3
Rate-Setting & Oversight
Every capital dollar has to be defensible
Whether you answer to the Public Service Commission or a state board, the question is the same: why this project, why now, why at this cost?
- The SC Public Service Commission regulates rates, capital recovery, and resource plans for the investor-owned utilities — Dominion Energy South Carolina and Duke — with the Office of Regulatory Staff representing the public interest.4
- Dominion's 2026 rate case seeks a $332 million annual increase at a 10.5% ROE (up from 9.94%), about $20 more a month for a typical residential customer — approvals are not a formality.4
- The 2025 Energy Security Act (H.3309), signed in May 2025, forces a six-month permitting decision window, adds annual rate-adjustment mechanisms, and creates a nuclear advisory council — reshaping how capital gets approved.7
- Santee Cooper is state-owned and sets its own rates through a board, but must still get approval to issue debt — it was cleared for up to $700 million for gas projects in late 2025.8
- The Base Load Review Act legacy still shapes every filing: the V.C. Summer collapse led Dominion to acquire SCANA for $14.6 billion in 2018, and ratepayers continue to carry the cost.11
Funding On The Table
The money is moving — can your plan absorb it?
South Carolina utilities are committing capital at a scale not seen in a generation. The constraint is readiness: which projects are shovel-ready, how the timing lines up, and how the old debt is retired alongside the new build.
- $700 million in new Santee Cooper debt (2025) for gas projects — ~$120M toward Canadys, ~$300M to convert Georgetown to gas, and $270M+ for gas expansion.8
- $2.7 billion from Brookfield under the V.C. Summer restart deal — removing roughly $2.6 billion of stranded nuclear debt from Santee Cooper customer bills, with a decision expected by 2028.9
- $431 million Kinder Morgan pipeline to supply the Canadys plant — new generation carries its own fuel-infrastructure capital.2
- $8B+ in new generation alone across the $5B Canadys and $3.2B Duke Anderson plants — before the transmission needed to connect gigawatt-scale load.2
- IRA elective (direct) pay puts utility-scale solar, storage, and nuclear tax credits in reach for public power and co-ops like Santee Cooper and Central — if projects qualify and land on time.
Where Invizion Fits
Turn South Carolina's grid build-out into a defensible capital plan
Invizion is scenario-based capital portfolio optimization built for utilities. When load forecasts jump, a grant lands, or a retirement date moves, you don't re-plan by hand for weeks — you model it and decide with a record to stand behind.
Model the “what-if” before it's forced on you
A data-center interconnect, a delayed transmission line, a moved retirement date — build the scenario and see the impact on the whole portfolio, side by side with today's plan.
Re-sequence 500 projects in a click
When priorities move, Invizion re-orders the portfolio automatically — accelerating, stretching, or deferring projects against the constraints you set, not weeks of spreadsheet surgery.
Give regulators or your board a defensible record
Every prioritization and trade-off is captured. When you're asked “why this project, why now,” the answer is documented — not reconstructed after the fact.
South Carolina's Grid, In Brief
Questions South Carolina utility leaders are asking
Short, sourced answers — the same facts we dig into with utilities looking at their capital programs.
How fast is South Carolina's electricity demand growing?
What happened with the V.C. Summer nuclear project?
What is the South Carolina Energy Security Act?
Does the Public Service Commission set my rates?
Is South Carolina still a nuclear state?
How does Invizion help South Carolina electric utilities plan capital?
Go Deeper
Related from Invizion
Explore Further
See how utilities keep capital plans defensible
Invizion helps utilities model, optimize, and defend their capital programs. Explore how it works, or read our latest thinking on capital planning across the utility sector.
Explore InvizionThis briefing was last reviewed September 2026.
Sources
- SC Daily Gazette — Gigawatt (1,000 MW) Colleton County data-center proposal; $6B campus; Google and Meta centers ~200 MW each; Santee Cooper's 1,100 MW Canadys share, Dec 2025. scdailygazette.com
- SC Daily Gazette — Canadys 2,200 MW, ~$5B (Dominion–Santee Cooper) plus $431M Kinder Morgan pipeline; Duke Anderson 1,400 MW, $3.2B, online ~2031, Jan 2026. scdailygazette.com
- SC Daily Gazette — Brookfield to pay Santee Cooper $2.7B in V.C. Summer restart; ~$9B spent on reactors that never ran; up to 25% ownership, Dec 8 2025. scdailygazette.com
- SC Daily Gazette — Dominion Energy South Carolina 2026 rate case: $332M increase, 10.5% ROE (up from 9.94%), ~$20/mo, 820,000 customers, Jan 2026. scdailygazette.com
- SC Daily Gazette — Data-center proposals declining; Duke backlog from 100+ to under 5; 470 MW current load; potential ~5,000 MW (10%); Dominion nine potential centers, Mar 2026. scdailygazette.com
- U.S. Energy Information Administration — South Carolina electricity profile: nuclear primary source; 100,485,416 MWh net generation and 24,706 MW summer capacity in 2024; 10.90 cents/kWh. eia.gov
- South Carolina General Assembly — H.3309, the Energy Security Act (Act No. 41), signed May 12 2025: Canadys joint venture, six-month permitting window, rate-adjustment mechanisms, nuclear advisory council. scstatehouse.gov
- SC Daily Gazette — Santee Cooper approved for up to $700M in debt for gas projects (~$120M Canadys, ~$300M Georgetown conversion, $270M+ expansion); Winyah coal retirement within a decade, Dec 3 2025. scdailygazette.com
- SC Daily Gazette — V.C. Summer restart prep underway; Brookfield decision expected by H1 2028; ~$2.6B debt to be removed, ~$1B remaining; Santee Cooper up to 25% ownership, Apr 2026. scdailygazette.com
- Duke Energy — Duke Energy Carolinas and Duke Energy Progress serve North and South Carolina; about half of Carolinas generation is nuclear (Oconee, Catawba). en.wikipedia.org
- Virgil C. Summer Nuclear Station (via Wikipedia) — Units 2 & 3 abandoned July 31 2017; original ~$9.8B estimate; Dominion acquired SCANA in 2018 for $14.6 billion. en.wikipedia.org
- Santee Cooper (via Wikipedia) — South Carolina's state-owned electric utility; 165,000+ direct customers; power for co-ops across 46 counties; Cross/Winyah coal, Rainey gas, 800 MW renewables. en.wikipedia.org
- Central Electric Power Cooperative — wholesale G&T for South Carolina's 19 distribution cooperatives; 2M+ South Carolinians; ~70% of the state's land mass across all 46 counties. cepci.org