Vermont · Electric & Grid Utilities
Vermont has to hit 100% renewable and end outages by 2030 — your capital plan is where both happen.
The Renewable Energy Standard now puts Green Mountain Power and Vermont's largest utilities on a 100%-renewable-by-2030 clock, while electrification pushes the state's peak into winter and storms grow costlier every year. Green Mountain Power alone has committed up to $280 million to end outages by 2030. Each of those forces reshuffles the projects on your list — Invizion helps electric utilities re-sequence a capital portfolio in a click, and defend every decision.
The Vermont Landscape
Four forces are moving your project list at once
None of these is theoretical, and none of them waits for your next budget cycle. Together they mean the capital plan you approved last year may already be the wrong plan.
Demand — Electrification
The peak is moving to winter
VELCO's 2024 long-range plan projects Vermont's peak flipping from summer to winter as heat pumps and EVs scale — from roughly 950 MW today toward as much as 1,389 MW by 2033 and 1,569 MW by 2043 under the state climate roadmap, about 2.4% annual growth for two decades, with some 420,000 EVs and 280,000 heat pumps by 2043.4
Vermont already generates only about 2.3 million MWh against 5.5 million MWh of retail sales, importing the balance through ISO New England — so new winter load lands on both the distribution system and the region.5
Reliability — Storms & Floods
The most expensive risk is weather
When GMP launched its Zero Outages Initiative it had booked about $45 million in storm repairs in a single year and roughly $115 million since 2013, with 60% of that damage in the prior five years and its three worst outage storms all inside twelve months.1
The July 2023 floods caused an estimated $2.2 billion in damage across the Northeast and drew a federal disaster declaration for Vermont, and 2024 flooding followed — resilience is now the load-bearing line in the capital plan.6
Generation — The 100% Clock
A renewable mandate with real deadlines
The 2024 Renewable Energy Standard update (Act 179) requires providers with 75,000+ customers to reach 100% renewable by January 1, 2030, and all remaining utilities by 2035, layering in a new-renewable tier (20% for large providers by 2035) and 20% distributed generation by 2032.2
GMP already runs 100% carbon-free and about 79% renewable annually, and Burlington Electric has sourced 100% renewable power since 2014 on a portfolio of biomass, hydro, and wind — but the new-build requirements convert those headlines into procurement and interconnection capital.7812
Capital — Harden & Modernize
Undergrounding, hardening, and storage at once
GMP's Zero Outages plan directs up to $280 million in its first phase — about $250 million to undergrounding and storm hardening and $30 million to energy storage — on top of the roughly 1,000 miles of distribution already underground.19
At the transmission layer, VELCO flags on the order of $650 million in upgrades potentially needed by 2034. New obligations don't replace the backlog — they stack on it, and something on the list has to move.4
Who Runs Vermont's Grid
One large investor-owned utility, plus municipals and cooperatives — all rate-regulated
Vermont is unusual: its roughly 17 distribution utilities include one dominant investor-owned company, a member cooperative, and more than a dozen municipals, and the Public Utility Commission regulates rates for all of them. The pressures are shared; the governance path differs.
Vermont's largest utilities
Distribution rates set by the PUC
The PUC regulates rates for all of Vermont's distribution utilities, and VELCO — owned by those utilities — runs the statewide transmission grid of about 740 miles and 46 substations.4
Municipal & cooperative systems
Locally governed, still PUC-regulated on rates
Rate-Setting & Oversight
Every capital dollar has to be defensible
In Vermont the Public Utility Commission sets rates for investor-owned, municipal, and cooperative utilities alike — so the question is the same for everyone: why this project, why now, why at this cost?
- Vermont Public Utility Commission (PUC) — a three-member quasi-judicial board that regulates rates, capital recovery, and resource planning for all of Vermont's electric distribution utilities.
- Renewable Energy Standard (Act 179 of 2024) — 100% renewable by 2030 for providers with 75,000+ customers and by 2035 for all others, with a new-renewable tier and 20% distributed generation by 2032.2
- Net metering is governed by 30 V.S.A. § 8010 and PUC Rule 5.100; Act 179 ended the virtual Group Net Metering program for applications after December 31, 2024, and directed a successor program.14
- GMP's Multi-Year Regulation Plan (FY27–FY30) — proposed for October 2026 through September 2030, it caps controllable budgets, smooths rate impacts, and ties recovery to performance metrics.15
Capital On The Table
The money is moving — can your plan absorb it?
Between utility resilience programs, transmission needs, and federal clean-energy incentives, Vermont utilities have more grid capital in motion than in a generation. The constraint is sequencing: which projects, in which order, against a fixed rate impact.
- GMP Zero Outages: up to $280M in its first phase — roughly $250M for undergrounding and storm hardening and $30M for energy storage, targeting zero outages by 2030.1
- ~$650M in transmission upgrades that VELCO's 2024 long-range plan says Vermont could need by 2034 to serve electrification if non-wires alternatives fall short.4
- The cost of not hardening: about $115M in storm damage since 2013 and $45M in a single recent year — the baseline every resilience dollar is measured against.1
- IRA elective (direct) pay lets Vermont's municipals and cooperatives — Burlington Electric, VEC, Washington Electric — monetize clean-energy tax credits they historically could not use, changing the math on solar and storage.
- Vermont Clean Energy Development Fund (Act 74 of 2005) continues to support small-scale renewables and storage deployment across the state.16
Where Invizion Fits
Turn Vermont's grid build-out into a defensible capital plan
Invizion is scenario-based capital portfolio optimization built for utilities. When load forecasts jump, a grant lands, or a retirement date moves, you don't re-plan by hand for weeks — you model it and decide with a record to stand behind.
Model the “what-if” before it's forced on you
A data-center interconnect, a delayed transmission line, a moved retirement date — build the scenario and see the impact on the whole portfolio, side by side with today's plan.
Re-sequence 500 projects in a click
When priorities move, Invizion re-orders the portfolio automatically — accelerating, stretching, or deferring projects against the constraints you set, not weeks of spreadsheet surgery.
Give regulators or your board a defensible record
Every prioritization and trade-off is captured. When you're asked “why this project, why now,” the answer is documented — not reconstructed after the fact.
Vermont's Grid, In Brief
Questions Vermont utility leaders are asking
Short, sourced answers — the same facts we dig into with utilities looking at their capital programs.
How fast is Vermont's electricity demand growing, and why winter?
When does Vermont have to be 100% renewable?
Why are storms and floods driving Vermont's capital plans?
Who sets my utility's rates in Vermont?
How does Green Mountain Power use home batteries?
How does Invizion help Vermont electric utilities plan capital?
Go Deeper
Related from Invizion
Explore Further
See how utilities keep capital plans defensible
Invizion helps utilities model, optimize, and defend their capital programs. Explore how it works, or read our latest thinking on capital planning across the utility sector.
Explore InvizionThis briefing was last reviewed September 2026.
Sources
- Green Mountain Power — "GMP Launches First-in-Nation 2030 Zero Outages Initiative," Oct. 10, 2023 (up to $280M first phase; ~$250M undergrounding/hardening + $30M storage; ~$115M storm damage since 2013). greenmountainpower.com
- Vermont Statutes Online — 30 V.S.A. § 8005, Renewable Energy Standard categories, as amended by Act 179 of 2024 (100% by 2030 for 75,000+ customer providers; 2035 for others). legislature.vermont.gov
- Green Mountain Power — "Growing Stored Energy Network Delivers $6M in Savings," July 28, 2026 (110 MW VPP; 53 MW home batteries; 5,000+ customers; ~10% of summer peak). greenmountainpower.com
- VELCO — 2024 Vermont Long-Range Transmission Plan (winter-peak shift to ~1,569 MW by 2043; ~420,000 EVs / 280,000 heat pumps; 740 mi / 46 substations; ~$650M upgrades by 2034). velco.com
- U.S. Energy Information Administration — Vermont State Electricity Profile (net generation ~2.26M MWh; retail sales ~5.46M MWh; 18.41¢/kWh; hydro primary; imports the balance). eia.gov
- Wikipedia — 2023 Vermont flood (~$2.2B in damage across the Northeast; federal disaster declaration for Vermont). en.wikipedia.org
- Green Mountain Power — 2024 Annual Energy Mix (100% carbon-free, ~79% renewable). greenmountainpower.com
- Wikipedia — Burlington, Vermont (100% renewable electricity since 2014; net-zero-by-2030 goal). en.wikipedia.org
- Wikipedia — Green Mountain Power (>70% of Vermont; ~265,000 customers; Énergir-owned; ~1,000 mi underground distribution). en.wikipedia.org
- Green Mountain Power — J.D. Power residential satisfaction release, Dec. 2025 (275,000+ residential and business customers). greenmountainpower.com
- Vermont Electric Cooperative — About (33,000+ members; 75 communities; member-owned since 1938). vermontelectric.coop
- Burlington Electric Department — Our Energy (McNeil 50 MW biomass; Winooski One 7.4 MW hydro; Sheffield / Georgia Mountain / Hancock wind). burlingtonelectric.com
- Wikipedia — Burlington Electric Department (over 19,600 customers; owns 50% of McNeil; Winooski One hydro). en.wikipedia.org
- Vermont Department of Public Service — Net Metering (30 V.S.A. § 8010; PUC Rule 5.100; Act 179 ended Group Net Metering after Dec. 31, 2024). publicservice.vermont.gov
- Green Mountain Power — "What's an MYRP and Why Should I Care?" (Multi-Year Regulation Plan proposed for Oct. 2026–Sept. 2030). greenmountainpower.com
- Vermont Department of Public Service — Clean Energy Development Fund (created by Act 74 of 2005, 30 V.S.A. § 8015). publicservice.vermont.gov