Virginia · Electric & Grid Utilities
Virginia's power demand is set to double in a decade. Your capital plan is where that gets built.
The world's largest data-center market is stacking gigawatts of new load onto Dominion's grid, just as the Clean Economy Act pushes toward a 2045 carbon-free deadline and offshore wind adds a $10.7 billion program. Every one of those forces reshuffles the projects on your list. Invizion helps electric utilities re-sequence a capital portfolio in a click — and defend every decision.
The Virginia Landscape
Four forces are moving your project list at once
None of these is theoretical, and none of them waits for your next budget cycle. Together they mean the capital plan you approved last year may already be the wrong plan.
Demand — Load Growth
The world's data-center capital, arriving on your grid
Dominion's transmission zone is growing about 5.5% a year, and JLARC's independent forecast finds Virginia's unconstrained power demand could double within a decade — after running essentially flat from 2006 to 2020.1
The driver is data centers: Virginia hosts more than 640 facilities and roughly 40% of the global market, with over 70% of the world's internet traffic crossing Loudoun's “Data Center Alley.”42 Every hyperscale campus is a multi-hundred-megawatt commitment competing for the same capital as Dominion serves its 2.5 million Virginia customers.5
Reliability — Resource Adequacy
Load growing faster than the grid can absorb
Meeting that load isn't only a generation problem. JLARC estimates the unconstrained forecast would need roughly 3,500 MW of new interzonal transmission and up to 73 TWh of imported energy a year to stay reliable through 2040.1
Virginia already generates about 103 million MWh a year, and the PJM system it sits inside is absorbing Mid-Atlantic load growth all at once — thinning the margin whenever projects slip.6
Generation — The Transition
A 2045 clean deadline, on a capital clock
The Virginia Clean Economy Act requires Dominion to be 100% carbon-free by 2045 and Appalachian Power by 2050 — the nation's first legally binding 100% clean-energy standard.7
That mandate is landing as a capital wave: the 2.6 GW, $10.7 billion Coastal Virginia Offshore Wind project — three roughly 880 MW phases serving 650,000-plus customers13 and up to 660,000 homes' worth of power8 — plus the roughly 56,300 MW of new generation JLARC says the unconstrained forecast would require by 2040.31
Capital — Grid & Transmission
Build generation and the wires, at the same time
Offshore wind alone is a $10.7 billion program, up from an initial $9.8 billion after interconnection and export-cable cost increases.3 On top of generation, JLARC projects a typical Dominion household's grid-related costs could rise $14–$37 a month by 2040 as transmission builds out.1
Federal dollars help at the margin — DOE's GRIP program is sending up to $250 million to a TVA-led project spanning parts of Virginia — but the backlog stacks faster than the grants.12
Who Runs Virginia's Grid
Two big investor-owned utilities, a large cooperative sector, and municipals
Virginia's grid is carried by two SCC-regulated investor-owned utilities, a wholesale generation-and-transmission cooperative and its distribution members, and a set of city-owned systems. The pressures are shared; the accountability path differs.
Investor-owned utilities
Rates & capital recovery regulated by the SCC
Dominion's flagship capital program includes the $10.7 billion Coastal Virginia Offshore Wind project.3
Cooperatives & municipal power
Governed by boards & members, not SCC base rates
Rate-Setting & Oversight
Every capital dollar has to be defensible
Whether you answer to the State Corporation Commission or a member board, the question is the same: why this project, why now, why at this cost?
- State Corporation Commission (SCC) regulates base rates, capital recovery, and Integrated Resource Plans for Dominion Energy Virginia and Appalachian Power.11
- 2023 rate-review reform (SB 1265 / HB 1770) restructured Dominion's oversight — following the 2015 SB 1349 freeze that had blocked the SCC from reviewing base rates until 2021 — moving the utility back toward regular biennial reviews.11
- VCEA-driven IRPs require Dominion (100% carbon-free by 2045) and Appalachian Power (by 2050) to file resource plans aligned with the state's clean-energy mandate.7
- Appalachian Power, an AEP subsidiary serving about 1.1 million customers, files its own rate cases and resource plan with the SCC.9
Funding On The Table
The money is moving — can your plan absorb it?
Virginia utilities have more grid capital in motion than in a generation. The constraint is readiness: which projects qualify, which are shovel-ready, and how the timing lines up against a decade of load growth.
- Coastal Virginia Offshore Wind — $10.7B VCEA-driven capital program for 2.6 GW across 176 turbines, in service around 2026–2027, with an estimated $3 billion in first-decade fuel savings.38
- DOE GRIP — up to $250M (TVA-led) grid-resilience funding spanning parts of Virginia and seven other states.12
- IRA direct-pay tax credits put utility-scale solar and storage in reach for public power and cooperatives such as ODEC and NOVEC.
- Data-center sales-tax exemption — $928M (FY23) in state savings underscores the scale of the load reshaping capital plans, and the cost-allocation debate behind every new line.1
Where Invizion Fits
Turn Virginia's grid build-out into a defensible capital plan
Invizion is scenario-based capital portfolio optimization built for utilities. When load forecasts jump, a grant lands, or a retirement date moves, you don't re-plan by hand for weeks — you model it and decide with a record to stand behind.
Model the “what-if” before it's forced on you
A data-center interconnect, a delayed transmission line, a moved retirement date — build the scenario and see the impact on the whole portfolio, side by side with today's plan.
Re-sequence 500 projects in a click
When priorities move, Invizion re-orders the portfolio automatically — accelerating, stretching, or deferring projects against the constraints you set, not weeks of spreadsheet surgery.
Give regulators or your board a defensible record
Every prioritization and trade-off is captured. When you're asked “why this project, why now,” the answer is documented — not reconstructed after the fact.
Virginia's Grid, In Brief
Questions Virginia utility leaders are asking
Short, sourced answers — the same facts we dig into with utilities looking at their capital programs.
How fast is Virginia's electricity demand growing?
Why is Virginia the center of data-center growth?
What is the Virginia Clean Economy Act?
What is Coastal Virginia Offshore Wind?
Who regulates Virginia electric utilities' rates?
How does Invizion help Virginia electric utilities plan capital?
Go Deeper
Related from Invizion
Explore Further
See how utilities keep capital plans defensible
Invizion helps utilities model, optimize, and defend their capital programs. Explore how it works, or read our latest thinking on capital planning across the utility sector.
Explore InvizionThis briefing was last reviewed September 2026.
Sources
- JLARC — Data Centers in Virginia (2024): unconstrained demand to double within 10 years, 5.5% growth in Dominion's zone, ~56,300 MW / 3,500 MW transmission needed by 2040, $14–$37/mo cost impact, $928M FY23 tax exemption. jlarc.virginia.gov
- Loudoun County Economic Development — “Data Center Alley”: more than 70% of the world's internet traffic flows through Loudoun's networks. biz.loudoun.gov
- Coastal Virginia Offshore Wind (Wikipedia) — $10.7B (Jan 2025, up from $9.8B), 2.6 GW, 176 Siemens Gamesa turbines, in service ~2026–2027. en.wikipedia.org
- Data center (Wikipedia) — Northern Virginia is the world's largest data-center concentration; Virginia hosts 643 facilities (2025) and ~40% of the global market (2023). en.wikipedia.org
- Dominion Energy Virginia — provides electricity to more than 2.5 million homes and businesses in Virginia. www.dominionenergy.com
- U.S. Energy Information Administration — Virginia Electricity Profile: ~102.7 million MWh net generation (2024), 10.62 cents/kWh average retail price. www.eia.gov
- Virginia Clean Economy Act (Wikipedia) — 2020 law; Dominion 100% carbon-free by 2045, Appalachian Power by 2050; nation's first legally binding 100% clean-energy standard. en.wikipedia.org
- CoastalVAWind.com (Dominion Energy) — 2.6 GW / 176 turbines, up to 660,000 homes, largest U.S. offshore wind project, ~$3B first-decade fuel savings, completion ~2027. coastalvawind.com
- Appalachian Power (AEP) — About: ~1.1 million customers across Virginia, West Virginia, and Tennessee; ~8,750 MW generation. www.appalachianpower.com
- Old Dominion Electric Cooperative (Wikipedia) — wholesale G&T serving 11 member cooperatives and nearly 1.5 million people across Virginia, Maryland, and Delaware. en.wikipedia.org
- Dominion Energy (Wikipedia) — regulatory history: 2015 SB 1349 froze SCC base-rate reviews until 2021; 2023 SB 1265 / HB 1770 restructured rate oversight. en.wikipedia.org
- U.S. Department of Energy, Grid Deployment Office — GRIP program: TVA-led award of up to $250 million spanning parts of Virginia and seven other states. www.energy.gov
- Dominion Energy — Coastal Virginia Offshore Wind: more than 2,600 MW across three ~880 MW phases, expected to serve more than 650,000 customers. www.dominionenergy.com