Florida · Natural Gas Utilities
Florida's gas system is growing with the state — and every mile of it competes for capital.
Florida's natural gas utilities are expanding into one of the fastest-growing states in the country while replacing legacy cast-iron and bare-steel pipe, absorbing a $1.2 billion pipeline build to relieve south-Florida supply constraints, and defending rate cases before the PSC. Each of those forces reshuffles the projects on your list. Invizion helps gas utilities re-sequence a capital portfolio in a click — and defend every decision.
The Florida Landscape
Four forces are moving your project list at once
Florida's gas story is different from the Northeast or California: the pressure here is growth and supply, not a looming ban. But the capital math is just as unforgiving — the plan you approved last year may already be the wrong plan.
System Integrity — Aging Pipe
Legacy cast iron and bare steel, on a replacement clock
Florida's newer systems sit alongside decades-old mains in its urban cores. Peoples Gas recovers the cost of retiring cast-iron and bare-steel pipe through a dedicated replacement rider — the 2023 rate order moved $11 million of that investment into base rates.3
Florida City Gas runs a parallel SAFE (Safety, Access and Facility Enhancement) program for accelerated recovery of replacing older portions of its roughly 3,800 miles of distribution main.64 Every mile retired is a mile that has to be scheduled, funded, and defended.
Decarbonization — Preemption
The gas ban Florida law won't allow
Unlike states running "future of gas" dockets, Florida has moved the other way. HB 919 (2021) prohibits any municipality, county, or special district from restricting the fuel sources of energy delivered to customers, and voided local policies that did.8
That protects gas-line extensions and new hookups — but it does not remove the long-horizon question. Throughput is dominated by power generation, not homes; residential and commercial burn is only about 5% of the state's gas use,9 so the LDC's growth case rests on winning connections in a competitive fuel market.
Supply — Pipeline Dependence
A state that consumes gas but barely produces it
Florida burned about 1.69 trillion cubic feet of natural gas in 2024 but produced only 356 million — a fraction of one percent of what it uses.109 Nearly every molecule arrives on long interstate pipelines, leaving the peninsula exposed to capacity constraints and storm risk.
South Florida is already supply-constrained: Chesapeake Utilities' $1.2 billion, 24-inch Florida Energy Pathway from Palm Beach to Miami-Dade — anchored by roughly 250,000 dekatherms/day of firm commitments — is being built to relieve it by 2030.7
Capital — Recovery & Rates
Rising bills meet a full capital docket
The capital is being spent and recovered through the PSC. Peoples Gas won a $118 million base-rate increase in 2023 at a 10.15% ROE midpoint;3 Florida City Gas landed a $23.3 million increase at a 9.50% ROE the same year.6
Florida residential gas already runs about $25.37 per thousand cubic feet — well above the national norm.11 Every new project has to earn its place against that affordability pressure.
Who Delivers Florida's Gas
Four investor-owned LDCs and a set of municipal districts
Florida's gas distribution is led by four PSC-regulated investor-owned utilities — two of them now under Chesapeake Utilities — alongside city- and district-owned systems that set their own rates. The pressures are shared; the accountability path differs.
Investor-owned gas LDCs
Rates & capital recovery regulated by the Florida PSC
Chesapeake Utilities now owns two of the four IOUs — it bought Florida City Gas from NextEra Energy for $923.4 million, closing December 1, 2023.4
Municipal & special-district systems
Rates set by local boards, not the PSC
Municipal and special-district systems set their own rates through local boards and are exempt from PSC rate regulation — but they carry the same aging-pipe and growth pressures as the investor-owned LDCs.12
Rate-Setting & Oversight
Every capital dollar has to be defensible
Whether you answer to the Public Service Commission or a municipal board, the question is the same: why this project, why now, why at this cost?
- Florida Public Service Commission (PSC) regulates the rates, capital recovery, and safety programs of the investor-owned gas LDCs — Peoples Gas, Florida City Gas, Florida Public Utilities, and St. Joe Natural Gas.3
- Peoples Gas 2023 rate order: the PSC approved a $118 million base-revenue increase (about $107 million net after transferring cast-iron/bare-steel investment into base rates), effective January 2024, at a 10.15% ROE midpoint and 54.7% equity.3
- Florida City Gas 2023 rate case: a $23.3 million increase (including $14.1 million incremental) at a 9.50% ROE, which also folded the SAFE replacement rider into base rates.6
- Infrastructure-replacement riders: Peoples Gas' cast-iron/bare-steel replacement rider and Florida City Gas' SAFE program provide accelerated cost recovery for retiring aging pipe — the primary capital-recovery mechanism for system-integrity work.36
- State preemption (HB 919, 2021): Florida law bars local governments from restricting the fuel sources delivered to customers, protecting gas-line extensions from local bans.8
Funding The Build
In Florida, capital recovery is mostly rider-based
Federal gas-modernization dollars are aimed at municipal systems, so Florida's investor-owned LDCs fund most of their build through PSC-approved riders and rate cases — and through private pipeline capital. The constraint is sequencing, not just access to money.
- Cast-iron / bare-steel replacement rider (Peoples Gas): accelerated recovery for retiring legacy pipe; the 2023 order transferred $11 million of that investment into base rates and the rider continues for ongoing work.3
- SAFE program (Florida City Gas): accelerated recovery of the cost of replacing older portions of the distribution system; $5.3 million of SAFE investment was moved into base rates in the June 2023 rate order.6
- Florida Energy Pathway ($1.2B): a 24-inch intrastate pipeline from Palm Beach to Miami-Dade, in service by 2030, financed with private capital — Chesapeake Utilities is selling up to a 49% ownership interest to partners.7
- PHMSA NGDISM grants ($200M/yr, $1B over five years): federal pipe-modernization money — but limited to municipal and community-owned utilities, so Florida's large investor-owned LDCs recover replacement costs through riders instead.13
Where Invizion Fits
Turn Florida's gas-system decisions into a defensible capital plan
Invizion is scenario-based capital portfolio optimization built for utilities. When a replacement mandate accelerates, throughput forecasts shift, or a decarbonization ruling lands, you don't re-plan by hand for weeks — you model it and decide with a record to stand behind.
Model the “what-if” before it's forced on you
A faster main-replacement schedule, a gas-line-extension ban, an RNG mandate — build the scenario and see the impact on the whole portfolio, side by side with today's plan.
Re-sequence 500 projects in a click
When priorities move, Invizion re-orders the portfolio automatically — accelerating, stretching, or deferring projects against the constraints you set, not weeks of spreadsheet surgery.
Give regulators or your board a defensible record
Every prioritization and trade-off is captured. When you're asked “why this project, why now,” the answer is documented — not reconstructed after the fact.
Florida's Gas Sector, In Brief
Questions Florida gas utility leaders are asking
Short, sourced answers — the same facts we dig into with utilities looking at their capital programs.
How many natural gas customers does Florida have?
Who are Florida's largest natural gas utilities?
Can Florida cities ban natural gas in new buildings?
How do Florida utilities pay to replace old gas pipe?
Why is Florida building the $1.2 billion Florida Energy Pathway?
How does Invizion help Florida gas utilities plan capital?
Go Deeper
Related from Invizion
Explore Further
See how utilities keep capital plans defensible
Invizion helps utilities model, optimize, and defend their capital programs. Explore how it works, or read our latest thinking on capital planning across the utility sector.
Explore InvizionThis briefing was last reviewed September 2026.
Sources
- U.S. Energy Information Administration — Number of Natural Gas Consumers in Florida by type, ~1,022,753 total / 945,906 residential (2024). www.eia.gov
- Peoples Gas System — About: more than 500,000 customers statewide, serving Florida since 1895, an Emera company. www.peoplesgas.com
- Emera Inc. Form 6-K (Apr 2024) — PSC approved Peoples Gas $118M base-revenue increase ($107M net after $11M from the cast-iron/bare-steel rider), 9.15%–11.15% ROE (10.15% midpoint), 54.7% equity, effective Jan 2024; ~490,000 customers. www.sec.gov
- Chesapeake Utilities — Florida City Gas acquisition from NextEra Energy: $923.4M cash, closed Dec 1 2023, ~120,000 customers, 8 counties, ~3,800 mi distribution + 80 mi transmission. www.chpk.com
- Florida City Gas — About: nearly 125,000 customers across eight counties; almost 4,000 miles of distribution and 80 miles of transmission pipeline; a Chesapeake Utilities company. www.floridacitygas.com
- Chesapeake Utilities Corporation 2025 Form 10-K — Florida City Gas SAFE program and June 2023 rate order ($23.3M increase, $14.1M incremental, 9.50% ROE, $5.3M SAFE moved to base rates); Florida Public Utilities 228,949 average gas customers (2025). www.sec.gov
- Chesapeake Utilities (PR Newswire, Jul 13 2026) — Florida Energy Pathway: ~$1.2B, 24-inch pipeline, Palm Beach to Miami-Dade, in service 2030, ~250,000 Dth/day firm commitments, upstream capacity via Florida Gas Transmission Phase IX. www.prnewswire.com
- Florida Legislature — HB 919 (2021), Chapter 2021-150: prohibits local governments from restricting fuel sources of energy delivered to customers; signed June 21, 2021. www.flsenate.gov
- U.S. Energy Information Administration — Florida Natural Gas Deliveries by End Use (2024): 1,694,240 MMcf total, 1,454,448 MMcf to electric power (~86%), residential 20,320, commercial 67,594. www.eia.gov
- U.S. Energy Information Administration — Florida Natural Gas Marketed Production: 356 MMcf (2024), a negligible fraction of state consumption. www.eia.gov
- U.S. Energy Information Administration — Florida Residential Natural Gas Price: $25.37 per thousand cubic feet (2024), $25.48 (2025). www.eia.gov
- Lake Apopka Natural Gas District — more than 30,000 customers in West Orange and South Lake counties; an independent special district created in 1959. www.langd.org
- PHMSA — Natural Gas Distribution Infrastructure Safety and Modernization (NGDISM) grants: $200M/year, $1B over five years, available to municipal or community-owned utilities. www.phmsa.dot.gov
- St. Joe Natural Gas Company — investor-owned natural gas utility in Port St. Joe / Gulf County, regulated by the Florida Public Service Commission. www.stjoegas.com
- Okaloosa Gas District — public natural gas district serving the northwest Florida panhandle (Valparaiso). okaloosagas.com
- Clearwater Gas System — municipal natural gas utility owned by the City of Clearwater. www.myclearwatergas.com