Indiana · Natural Gas Utilities
Indiana lets you recover infrastructure spend fast — but only 2% a year, and only if it's justified.
The TDSIC tracker returns 80% of approved capital almost in real time, yet a 2% annual revenue cap and a commission that now rejects under-justified plans mean every mile of replacement has to earn its place. Aging main, decarbonization, and winter price swings all compete for the same constrained recovery. Invizion helps gas utilities re-sequence a capital portfolio in a click — and defend every project against the cap.
The Indiana Landscape
Four forces are moving your project list at once
None of these waits for your next budget cycle, and all of them draw on the same capped pool of infrastructure recovery. The plan you filed last year may already be the wrong plan.
Safety — Aging Pipe
Replacing the last iron and bare steel, mile by mile
Nationally only about 1% of gas distribution pipe was still iron at the end of 2025;5 Indiana's LDCs are working down the remaining cast-iron and bare-steel main under TDSIC infrastructure plans first approved in 2014.6
With roughly 2.0 million gas consumers on the system,1 integrity and modernization work is continuous, not one-time — and PHMSA distribution-integrity duties keep it non-discretionary.
Transition — Decarbonization
Planning for throughput that may not grow
NiSource, NIPSCO's parent, has committed to cutting carbon emissions more than 90% by 2028 and is investing roughly $20 billion in regulated utility infrastructure over five years.87
Building electrification, efficiency, and long-run demand uncertainty pressure gas throughput even as the system needs capital — the stranded-asset risk that reshapes every long-horizon plan.
Supply — Price & Peaks
Commodity swings pass straight through the bill
Indiana residential customers paid about $11.49 per Mcf in 2025 while the citygate price was $4.282 — most of the bill is delivery, but the commodity share still moves with the market through quarterly gas cost adjustments.3
The state burns roughly 914 Bcf of gas a year, heavily winter-weighted,9 so design-day, storage, and peaking decisions sit right alongside the replacement backlog.
Capital — Recovery
TDSIC recovers 80% now — if the costs hold up
Under the TDSIC statute a utility recovers 80% of approved infrastructure spend through a periodic tracker and defers 20% to its next rate case,10 but total TDSIC increases are capped at 2% of retail revenue a year.4
The guardrails have teeth: the IURC denied NIPSCO's roughly $741 million gas TDSIC plan in 2026 for a lack of cost justification.3 A plan that can't be defended doesn't get recovered.
Who Delivers Indiana's Gas
A few large investor-owned LDCs, a big public trust, and a tail of municipals
Indiana's gas is delivered by IURC-regulated investor-owned utilities, the publicly governed Citizens Energy Group in Indianapolis, and dozens of municipal systems. The pressures are shared; the accountability path differs.
Investor-owned gas LDCs
Rates & capital recovery regulated by the IURC
NIPSCO alone serves roughly 900,000 gas customers, and NiSource plans about $20 billion of regulated infrastructure investment over five years.117
Public trust & municipal systems
Publicly governed, not investor-owned
Citizens Gas has operated on base rates set in 2011, among the oldest of any regulated Indiana gas utility.17
Rate-Setting & Recovery
Every capital dollar has to clear the tracker — and the cap
Indiana pairs one of the most utility-friendly recovery mechanisms in the country with a hard revenue cap and a commission willing to say no. The question stays the same: why this project, why now, why at this cost?
- Indiana Utility Regulatory Commission (IURC) sets rates and reviews infrastructure trackers for the investor-owned gas LDCs; the Office of Utility Consumer Counselor (OUCC) represents ratepayers.15
- TDSIC (IC 8-1-39) lets utilities recover 80% of approved infrastructure spend through a periodic tracker and defer 20% to the next rate case,10 subject to a 2%-of-retail-revenue annual cap.4 CenterPoint's North (Cause 45611) and South (Cause 45612) gas plans, first authorized in 2014, run as multi-year (five-year) programs.616
- NIPSCO's 2024 gas rate order (Cause 45967) granted a $120.9 million increase, below the $161.9 million requested; its roughly $741 million gas TDSIC plan (Cause 46342) was later denied for lack of cost justification — approvals are not a formality.3
- CenterPoint Energy Indiana South's 2021 settlement (Cause 45447) added $20.5 million against a $29.6 million request and cut the residential fixed charge from $25.10 to $16.50.16
How The Capital Gets Recovered
In Indiana, the surcharge is the funding story
Little federal grant money flows to gas distribution here, so the capital-recovery mechanisms — not grants — are what fund modernization. That makes tracker discipline the whole ballgame.
- TDSIC tracker is the primary capital-recovery vehicle: 80% of approved spend recovered on a rolling basis, 20% deferred — all under the 2% annual revenue cap.104
- ~$20B NiSource five-year capital plan — 100% regulated utility infrastructure across its footprint, with a large share landing at NIPSCO in Indiana.7
- NIPSCO 2024 base-rate increase of $120.9M (Cause 45967) funds ongoing gas system work embedded in base rates.3
- Ohio Valley Gas won roughly $12 million (a ~35% request) in its 2024 rate case (Cause 46011) and recovers infrastructure through its own long-term plan (Cause 45400).14
- CenterPoint Indiana North's TDSIC (Cause 45611) continues to recover bare-steel and cast-iron main replacement on a rolling basis.6
Where Invizion Fits
Turn Indiana's gas-system decisions into a defensible capital plan
Invizion is scenario-based capital portfolio optimization built for utilities. When a replacement mandate accelerates, throughput forecasts shift, or a decarbonization ruling lands, you don't re-plan by hand for weeks — you model it and decide with a record to stand behind.
Model the “what-if” before it's forced on you
A faster main-replacement schedule, a gas-line-extension ban, an RNG mandate — build the scenario and see the impact on the whole portfolio, side by side with today's plan.
Re-sequence 500 projects in a click
When priorities move, Invizion re-orders the portfolio automatically — accelerating, stretching, or deferring projects against the constraints you set, not weeks of spreadsheet surgery.
Give regulators or your board a defensible record
Every prioritization and trade-off is captured. When you're asked “why this project, why now,” the answer is documented — not reconstructed after the fact.
Indiana's Gas Sector, In Brief
Questions Indiana gas utility leaders are asking
Short, sourced answers — the same facts we dig into with utilities looking at their capital programs.
Who regulates natural gas rates in Indiana?
What is the TDSIC and how does it work?
Which utilities distribute natural gas in Indiana?
Why did the IURC reject NIPSCO's gas TDSIC plan?
What's driving Indiana gas capital plans right now?
How does Invizion help Indiana gas utilities plan capital?
Go Deeper
Related from Invizion
Explore Further
See how utilities keep capital plans defensible
Invizion helps utilities model, optimize, and defend their capital programs. Explore how it works, or read our latest thinking on capital planning across the utility sector.
Explore InvizionThis briefing was last reviewed September 2026.
Sources
- U.S. Energy Information Administration — Indiana natural gas number of consumers (residential ~1,866,080; total ~2,038,081), 2024. www.eia.gov
- U.S. Energy Information Administration — Indiana natural gas prices: residential $11.49/Mcf, citygate $4.28/Mcf, 2025. www.eia.gov
- Indiana OUCC — NIPSCO gas key cases: 2024 base-rate order (Cause 45967) $120.9M vs. $161.9M requested; ~$741M gas TDSIC (Cause 46342) denied; quarterly GCA (Cause 43629). www.in.gov/oucc
- Indiana Code IC 8-1-39-14 — TDSIC may not raise a utility's total retail revenues more than 2% in a 12-month period. law.justia.com
- PHMSA — Pipeline Replacement Background: ~99% of U.S. gas distribution pipe was plastic or steel at the end of 2025, ~1% iron. www.phmsa.dot.gov
- Indiana OUCC — CenterPoint Energy Indiana North (Vectren North / Indiana Gas): base rate Cause 45468 (2021), TDSIC Cause 45611 (approved April 2022, five-year), first gas TDSIC approved 2014. www.in.gov/oucc
- NiSource Investor Relations — ~$20 billion of 100% regulated utility infrastructure investment over five years. investors.nisource.com
- NiSource (overview) — commitment to cut carbon emissions more than 90% by 2028; ~3.5 million natural gas customers across six states. en.wikipedia.org
- U.S. Energy Information Administration — Indiana natural gas consumption/deliveries ~913,801 MMcf (2024). www.eia.gov
- Indiana Code IC 8-1-39-9 — timely recovery of 80% of approved capital expenditures and TDSIC costs, with the remaining 20% deferred to the next general rate case. law.justia.com
- NIPSCO — About Us: ~900,000 natural gas customers, 30+ northern Indiana counties, the state's largest gas distribution company. www.nipsco.com
- Vectren / CenterPoint Energy Indiana — ~680,000 Indiana gas customers (~570,000 central Indiana, ~110,000 southwestern Indiana). en.wikipedia.org
- Citizens Energy Group — natural gas service to ~266,000 homes and businesses in Marion County. info.citizensenergygroup.com
- Indiana OUCC — Ohio Valley Gas key cases: 16 east-central/southern/western counties; 2024 rate case (Cause 46011, ~$12M / ~35% request, order Nov. 6, 2024); infrastructure plan (Cause 45400). www.in.gov/oucc
- Indiana Utility Regulatory Commission — Energy Division / Natural Gas Industry (regulator of jurisdictional gas utilities). www.in.gov/iurc
- Indiana OUCC — CenterPoint Energy Indiana South (Vectren South / SIGECO): base rate Cause 45447 settlement (Oct. 6, 2021) $20.5M vs. $29.6M requested; residential fixed charge cut $25.10→$16.50; TDSIC Cause 45612. www.in.gov/oucc
- Indiana OUCC — Citizens Gas key cases: current base rates set in 2011 (Cause 43975). www.in.gov/oucc