Indiana · Electric & Grid Utilities

About 60 data centers want onto Indiana's grid. Your capital plan decides what gets built — and when.

Hyperscale AI campuses are stacking gigawatts of new load onto a coal-heavy grid just as that coal fleet retires and gigawatts of new gas and transmission get filed. Each new large-load deal, retirement date, and CPCN reshuffles the projects on your list. Invizion helps electric utilities re-sequence a capital portfolio in a click — and defend every decision.

The bottom line: Indiana's coal-heavy grid is being asked to add gigawatts of gas and transmission for about 60 proposed data centers while its coal fleet retires by 2028. The utilities that keep capital defensible will be the ones whose plans can re-sequence as fast as the load forecast moves.
~601
Large AI hyperscale data centers proposed in Indiana in roughly two years — a single campus can use as much power as 730,000 Hoosier homes.
5.6 GW1
New gas-fired capacity NIPSCO and Indiana Michigan Power together plan to build by 2030 (7.8 GW by 2035) to serve that load.
2,600 MW2
I&M's Rockport coal plant, slated to fully retire by the end of 2028 — one piece of a statewide coal exit.
$30B3
MISO's 2024 long-range transmission plan across its Midwest footprint, including Indiana.

The Indiana Landscape

Four forces are moving your project list at once

None of these is theoretical, and none waits for your next budget cycle. Together they mean the capital plan you approved last year may already be the wrong plan.

Demand — Load Growth

Gigawatts of data-center load, arriving fast

Roughly 60 large AI hyperscale data centers have been proposed in Indiana in about two years, and a single campus can draw as much power as 730,000 Hoosier households.1 Amazon's New Carlisle campus — now the company's largest data center — is sized at roughly 2,400–2,800 MW.41

NIPSCO is standing up a 2,600 MW gas plant for Amazon and has signed a long-term energy agreement with an Alphabet (Google) subsidiary for another large data center in northern Indiana.15 Every one of these is a capacity commitment competing for the same capital.

Reliability — Coal Exit vs. Load

Retiring coal while demand spikes

Indiana still leans hard on coal — its power sector is the 5th-largest CO₂ emitter in the nation — and that fleet is now coming offline.6 The collision with new load is already visible: in December 2025 a federal order delayed the retirement of NIPSCO's R.M. Schahfer coal units to hold capacity on the system.5

As a MISO state, Indiana's resource adequacy is settled in a 15-state market where reserve margins are tightening — so the reliability answer depends on new projects landing on schedule.3

Generation — The Transition

Coal out, gas and renewables in — on a capital clock

The retirements are stacked close together: I&M's 2,600 MW Rockport plant by the end of 2028,2 AES Indiana's Petersburg units converting to gas by 2026 (with a new 200 MW / 800 MWh battery already online),7 and CenterPoint's Culley Unit 3 converting to gas by 2027.8 Duke's 3,132 MW Gibson plant — among the largest coal stations in the U.S. — is slated to retire in 2037–2041.9

NIPSCO aims to cut carbon more than 90% by 2028, and it and I&M together plan 5.6 GW of new gas by 2030.101 Each conversion, retirement, and build has to be sequenced into one capital plan.

Capital — Grid & Transmission

Interconnection and transmission, at data-center scale

MISO approved roughly $30 billion of long-range transmission across its Midwest footprint in 2024, and Indiana is squarely inside it.3 On top of that, large-load interconnection is now a capital line of its own: Meta's LEAP-district project alone carries about $896 million in transmission upgrades, I&M has committed $400 million-plus for Google and Amazon connections, and Duke has approved $216 million in network upgrades.1

New obligations don't replace the backlog. They stack on top of it, and something on the list has to move.

Who Runs Indiana's Grid

Five investor-owned utilities, plus municipals and cooperatives

Indiana's grid is carried by five IURC-regulated investor-owned utilities, a set of municipal power agencies, and generation-and-transmission cooperatives. The pressures are shared; the accountability path differs.

Investor-owned utilities

Rates & capital recovery regulated by the IURC

AES Indiana (IPL) 500,000+ customers · Indianapolis area11
Duke Energy Indiana Indiana's largest electric utility12
CenterPoint Energy Indiana (Vectren) ~142,000 electric customers · SW Indiana / Evansville13
Indiana Michigan Power (AEP) NE Indiana & Fort Wayne · operates the Cook nuclear plant14
NIPSCO (NiSource) ~500,000 customers · northern Indiana10

NIPSCO and I&M alone plan 5.6 GW of new gas capacity by 2030 — roughly the entire combined customer base of both utilities.1

Public power & cooperatives

Governed by boards & members, not IURC rates

Indiana Municipal Power Agency (IMPA) Wholesale to member municipal utilities; co-owns Gibson Unit 59
Wabash Valley Power Alliance G&T cooperative; co-owns Gibson Unit 59
Hoosier Energy G&T cooperative · central & southern Indiana
Distribution cooperatives Member-owned local distribution across rural Indiana

Rate-Setting & Oversight

Every capital dollar has to be defensible

Whether the project is a gas plant, a transmission line, or a data-center interconnection, the IURC question is the same: why this project, why now, why at this cost?

  • Indiana Utility Regulatory Commission (IURC) regulates rates, capital recovery, Integrated Resource Plans, and Certificates of Public Convenience and Necessity (CPCNs) for the five investor-owned electric utilities; the Office of Utility Consumer Counselor represents ratepayers.15
  • New generation needs a CPCN. The 5.6 GW of gas NIPSCO and I&M plan by 2030 — plus battery and renewable additions — each runs the CPCN gauntlet before it earns recovery.115
  • Large-load cost allocation is now the fight. The IURC is weighing who pays for data-center-driven upgrades — Meta's LEAP project alone carries ~$896M in transmission work, I&M $400M+ for Google and Amazon, and Duke $216M in network upgrades.1
  • Cooperatives and municipals set their own rates through member boards and agency governance — public capital decisions made outside the IURC docket.9

Funding On The Table

The money is moving — can your plan absorb it?

Between MISO transmission, federal grid programs, and load customers footing their own interconnection, Indiana utilities have more grid capital in motion than in a generation. The constraint is readiness: which projects qualify, which are shovel-ready, and how the timing lines up.

  • MISO long-range transmission: ~$30B approved across the Midwest footprint in 2024, with projects targeted for the early-to-mid 2030s — Indiana is inside the plan.3
  • DOE GRIP: $7.6B nationally across 105 projects (with a $4.2B second round) for grid resilience and capacity — a pool Indiana utilities and coops compete into.16
  • Data-center-funded grid upgrades are real capital hitting the system now: ~$896M (Meta / LEAP), $400M+ (I&M for Google and Amazon), and $216M (Duke) in network work tied to large-load deals.1
  • USDA New ERA/PACE and IRA elective-pay (direct-pay) let Indiana's cooperatives and municipals — Hoosier Energy, Wabash Valley Power, IMPA — finance clean generation and claim tax credits as cash, changing the math on what they can build.

Where Invizion Fits

Turn Indiana's grid build-out into a defensible capital plan

Invizion is scenario-based capital portfolio optimization built for utilities. When load forecasts jump, a grant lands, or a retirement date moves, you don't re-plan by hand for weeks — you model it and decide with a record to stand behind.

1

Model the “what-if” before it's forced on you

A data-center interconnect, a delayed transmission line, a moved retirement date — build the scenario and see the impact on the whole portfolio, side by side with today's plan.

2

Re-sequence 500 projects in a click

When priorities move, Invizion re-orders the portfolio automatically — accelerating, stretching, or deferring projects against the constraints you set, not weeks of spreadsheet surgery.

3

Give regulators or your board a defensible record

Every prioritization and trade-off is captured. When you're asked “why this project, why now,” the answer is documented — not reconstructed after the fact.

Indiana's Grid, In Brief

Questions Indiana utility leaders are asking

Short, sourced answers — the same facts we dig into with utilities looking at their capital programs.

How fast is Indiana's electricity demand growing?
About 60 large AI hyperscale data centers have been proposed in roughly two years, and NIPSCO and I&M together plan 5.6 GW of new gas by 2030 (7.8 GW by 2035) largely to serve them — roughly the combined load of both utilities' entire customer bases.1
What's happening to Indiana's coal plants?
They're retiring or converting: I&M's Rockport by end of 2028, AES Petersburg to gas by 2026, CenterPoint's Culley Unit 3 to gas by 2027, and Duke's Gibson in 2037–2041; NIPSCO aims to cut carbon more than 90% by 2028.278910
Who regulates Indiana electric utilities' rates?
The IURC regulates rates, resource plans, and CPCNs for the five investor-owned utilities — AES Indiana, Duke Energy Indiana, CenterPoint, I&M, and NIPSCO. Municipal agencies and cooperatives set their own rates through boards and members.15
Will data centers raise everyone else's rates?
That's the live question at the IURC. Large-load deals carry hundreds of millions in grid upgrades — roughly $896M for Meta at LEAP, $400M+ at I&M for Google and Amazon, and $216M at Duke — and how those costs are allocated between hyperscalers and existing customers is being fought case by case.1
Can the grid stay reliable as coal retires?
It's tight: Indiana's power sector is the 5th-largest CO₂ emitter as coal still carries much of the load, and in December 2025 a federal order delayed NIPSCO's Schahfer coal retirement to keep capacity online — while MISO builds ~$30B of transmission to firm up the region.653
How does Invizion help Indiana electric utilities plan capital?
Invizion is scenario-based capital portfolio optimization for utilities. It lets you model how a new data-center deal, a CPCN outcome, a delayed transmission line, or a moved coal-retirement date reshuffles your whole project list, re-sequence the portfolio automatically, and keep a defensible record of every decision for the IURC or your board.

About the Author

GB

Guy Barlow

President, Invizion

Guy Barlow leads Invizion, a capital lifecycle management platform for water and wastewater utilities. He has spent two decades at the intersection of utility capital programs, funding, and analytics, helping utilities make faster, more defensible capital decisions.

Explore Further

See how utilities keep capital plans defensible

Invizion helps utilities model, optimize, and defend their capital programs. Explore how it works, or read our latest thinking on capital planning across the utility sector.

Explore Invizion

This briefing was last reviewed September 2026.

Sources

  1. Citizens Action Coalition of Indiana — Indiana data-center load: ~60 proposed hyperscale centers, NIPSCO/I&M 5.6 GW gas by 2030 (7.8 GW by 2035), NIPSCO 2,600 MW gas for Amazon, Amazon New Carlisle ~2,400–2,800 MW, Meta/LEAP ~$896M, I&M $400M+, Duke $216M. www.citact.org
  2. Wikipedia — Rockport Power Plant (Indiana Michigan Power/AEP): 2,600 MW (two 1,300 MW units), both retiring by end of 2028. en.wikipedia.org
  3. Wikipedia — Midcontinent Independent System Operator (MISO): 15 states including Indiana; ~$30B long-range transmission plan approved December 2024, in service ~2032–2034. en.wikipedia.org
  4. Wikipedia — New Carlisle, Indiana: home to Amazon's largest data center as of 2025. en.wikipedia.org
  5. NIPSCO Newsroom — long-term energy agreement with an Alphabet (Google) subsidiary for a northern-Indiana data center (April 2026); federal order delays R.M. Schahfer Generating Station retirement (December 2025). www.nipsco.com
  6. U.S. EIA — Indiana Electricity Profile 2024: net generation 97,012,880 MWh (17th); net summer capacity 27,837 MW; power-sector CO₂ 61,437 thousand metric tons (5th-highest nationally). www.eia.gov
  7. Wikipedia — Petersburg Generating Station (AES Indiana): 2,146 MW / four coal units, switching to natural gas by 2026; 200 MW / 800 MWh battery online 2025. en.wikipedia.org
  8. Wikipedia — F.B. Culley Generating Station (CenterPoint/Vectren): Unit 2 retired 2023; Unit 3 converting to natural gas by 2027. en.wikipedia.org
  9. Wikipedia — Gibson Generating Station (Duke Energy Indiana): 3,132 MW across five units, retirement planned 2037–2041; Wabash Valley Power and Indiana Municipal Power each co-own 24.5% of Unit 5. en.wikipedia.org
  10. Wikipedia — NiSource: NIPSCO serves nearly 500,000 electric customers in northern Indiana; 2019 plan to retire coal and cut carbon more than 90% by 2028. en.wikipedia.org
  11. Wikipedia — AES Indiana (Indianapolis Power & Light): more than 500,000 customers in a 528-square-mile service territory. en.wikipedia.org
  12. Duke Energy Indiana — About: Indiana's largest electric utility. www.duke-energy.com
  13. Wikipedia — Vectren / CenterPoint Energy Indiana: ~142,000 electric customers in southwestern Indiana. en.wikipedia.org
  14. Wikipedia — Indiana Michigan Power (AEP): serves northeastern/east-central Indiana including Fort Wayne and southwest Michigan; operates the D.C. Cook nuclear plant. en.wikipedia.org
  15. Indiana Utility Regulatory Commission (IURC) — regulator of rates, IRPs, and CPCNs for Indiana's investor-owned electric utilities. www.in.gov/iurc
  16. U.S. DOE Grid Deployment Office — GRIP program: $7.6B across 105 projects nationally (including a $4.2B second round). www.energy.gov