Missouri · Electric & Grid Utilities
Missouri is planning its biggest generation build in a generation. Your capital plan is where it happens.
Data centers are stacking gigawatts of new load onto a grid split between MISO and SPP, coal is retiring, and Senate Bill 4 now lets utilities recover construction costs in real time — so new gas, nuclear, and transmission all compete for the same dollars. Each of those forces reshuffles the projects on your list. Invizion helps electric utilities re-sequence a capital portfolio in a click — and defend every decision.
The Missouri Landscape
Four forces are moving your project list at once
None of these is theoretical, and none of them waits for your next budget cycle. Together they mean the capital plan you approved last year may already be the wrong plan.
Demand — Load Growth
Gigawatts of new load, arriving fast
Missouri already hosts 91 active data centers with at least 14 more in development,1 and utilities told FERC that demand is rising “at a rate unseen since World War II,” particularly across MISO and SPP.6
Nationally, electricity use is projected to climb 16–25% by 2034 — and every hyperscale campus that lands near St. Charles, Kansas City, or mid-Missouri is a multi-hundred-megawatt commitment competing for the same capital.5
Reliability — Two RTOs
Thin margins across MISO and SPP
SPP ordered rolling blackouts across western Missouri during the February 2021 cold snap,7 and it now projects a 5,950 MW capacity shortfall by 2029, while MISO sees a need for roughly 17 GW of new generation over 20 years.2
Missouri straddles both RTOs — MISO in the north and mid-state, SPP in the west and south — so resource adequacy depends on projects landing on schedule in two markets at once.6
Generation — The Transition
Coal out; gas, nuclear, and renewables in
Ameren Missouri closed the 1,178 MW Rush Island coal plant in October 20248 and is replacing capacity with an 800 MW simple-cycle gas plant by 2027, a combined-cycle unit in 2033, and 2,800 MW of wind and solar by 2030 on the way to net-zero by 2045.9
The 1,215 MW Callaway plant — the state's only reactor, supplying about 15% of Missouri's electricity — anchors the plan, and Ameren now aims to add 1,500 MW of new nuclear at the site by 2045.1110
Capital — Grid & Transmission
Build generation and transmission at once
The $11 billion, 5,000 MW Grain Belt Express is being built across Missouri,4 and Ameren is layering on MISO transmission work — roughly $940 million and $718 million on two projects due in service in 2034 — plus $2.65 billion of capital in the first half of 2026 alone.3
Coal replacement, new gas, nuclear, and transmission are all competing for the same dollars and the same crews. Something on the list has to move.
Who Runs Missouri's Grid
Two large investor-owned utilities, a major generation co-op, and municipals
Missouri's grid is carried by PSC-regulated investor-owned utilities, one of the nation's largest generation-and-transmission cooperatives, and municipal systems. The pressures are shared; the accountability path differs.
Investor-owned utilities
Rates & capital recovery regulated by the Missouri PSC
Ameren plans $2.65 billion of capital in the first half of 2026 alone and is filing new Missouri rates for mid-2027.3
Cooperatives & public power
Governed by boards & members, not PSC rates
AECI serves about 2.1 million member-consumers across Missouri, Oklahoma, and Iowa — capital decisions made by member boards, not the PSC.14
Rate-Setting & Oversight
Every capital dollar has to be defensible
Whether you answer to the Public Service Commission or a member board, the question is the same: why this project, why now, why at this cost?
- Missouri Public Service Commission (PSC) regulates rates, resource plans, and capital recovery for investor-owned utilities including Ameren Missouri, Evergy Missouri, and Liberty/Empire.16
- Senate Bill 4 (2025), signed by Gov. Kehoe in April 2025, unlocked construction-work-in-progress (CWIP) recovery for new natural gas generation and moved gas and water rates to a forward test year — reversing a CWIP ban Missouri voters approved in 1976.172
- Integrated Resource Planning now requires 16-year demand-and-supply projections, and CWIP eligibility is tied to generation approved in those plans.2
- Ameren Missouri rate filing targeting mid-2027 seeks recovery for grid upgrades and new generation, with a proposed roughly $13/month average residential increase.3
Funding On The Table
The money is moving — can your plan absorb it?
Missouri utilities have more generation and transmission capital in motion than they've had in decades. The constraint is readiness: which projects qualify, which are shovel-ready, and how the timing lines up.
- Grain Belt Express: $11B private transmission — a 5,000 MW line crossing Missouri, largely funded by developer Invenergy, with an Ameren connector line in Callaway and Montgomery counties targeted for about 2029.415
- Ameren MISO transmission: ~$940M + ~$718M on two regional projects due in service in 2034.3
- DOE nuclear loan program: $17.5B announced June 2026 for up to 10 large reactors — Missouri's Advanced Nuclear Energy Task Force is pushing for one at Callaway.10
- SB 4 CWIP cost recovery lets utilities earn on generation while it is under construction — an Energy Innovation analysis projects average household bills up roughly $640/year by 2035 as that capital flows.217
Where Invizion Fits
Turn Missouri's grid build-out into a defensible capital plan
Invizion is scenario-based capital portfolio optimization built for utilities. When load forecasts jump, a grant lands, or a retirement date moves, you don't re-plan by hand for weeks — you model it and decide with a record to stand behind.
Model the “what-if” before it's forced on you
A data-center interconnect, a delayed transmission line, a moved retirement date — build the scenario and see the impact on the whole portfolio, side by side with today's plan.
Re-sequence 500 projects in a click
When priorities move, Invizion re-orders the portfolio automatically — accelerating, stretching, or deferring projects against the constraints you set, not weeks of spreadsheet surgery.
Give regulators or your board a defensible record
Every prioritization and trade-off is captured. When you're asked “why this project, why now,” the answer is documented — not reconstructed after the fact.
Missouri's Grid, In Brief
Questions Missouri utility leaders are asking
Short, sourced answers — the same facts we dig into with utilities looking at their capital programs.
How fast is Missouri's electricity demand growing?
What is Senate Bill 4 and why does it matter?
What's happening to Missouri's coal and nuclear plants?
Who regulates Missouri's electric utilities?
Can the grid keep up as demand climbs?
How does Invizion help Missouri electric utilities plan capital?
Go Deeper
Related from Invizion
Explore Further
See how utilities keep capital plans defensible
Invizion helps utilities model, optimize, and defend their capital programs. Explore how it works, or read our latest thinking on capital planning across the utility sector.
Explore InvizionThis briefing was last reviewed September 2026.
Sources
- Missouri Independent — “They're already here”: 91 active data centers, 14 in development in Missouri, June 5, 2026. missouriindependent.com
- Missouri Independent — Massive utility legislation (SB 4): CWIP for gas, forward test year, SPP 5,950 MW shortfall by 2029, MISO ~17 GW over 20 years, 1976 CWIP ban, March 7, 2025. missouriindependent.com
- StockTitan — Ameren (AEE) news: West Alton 2,100 MW gas by 2031; MISO transmission ~$940M and ~$718M due 2034; $2.65B H1 2026 capex; mid-2027 Missouri rate filing (~$13/mo), 2026. stocktitan.net
- Grain Belt Express (Invenergy) — 5,000 MW line, Kansas–Missouri–Illinois, $11 billion private transmission investment. grainbeltexpress.com
- Missouri Independent — Missouri power grid faces costly upgrades as AI data centers drive demand; U.S. electricity use projected +16–25% by 2034, Aug 27, 2026. missouriindependent.com
- Missouri Independent — Utilities' FERC filing: demand rising at a rate “unseen since World War II” in MISO and SPP; Missouri split between the two RTOs, July 22, 2026. missouriindependent.com
- Missouri Independent — SPP investigators on the February 2021 rolling blackouts across Kansas and western Missouri, July 26, 2021. missouriindependent.com
- Missouri Independent — Ameren Missouri's 1,178 MW Rush Island coal plant to close (October 2024), Oct 11, 2024. missouriindependent.com
- Missouri Independent — Ameren Missouri IRP: 800 MW gas by 2027, combined-cycle in 2033, 2,800 MW wind/solar by 2030, net-zero by 2045, Sept 26, 2023. missouriindependent.com
- Missouri Independent — Missouri eyes nuclear expansion at Callaway (~15% of state power, license to 2044, Ameren +1,500 MW nuclear by 2045, DOE $17.5B nuclear loans), July 8, 2026. missouriindependent.com
- Wikipedia — Callaway Nuclear Generating Station: 1,215 MW nameplate (~1,190 MWe net), Missouri's only reactor, Ameren Missouri-operated, in service 1984. en.wikipedia.org
- Wikipedia — Ameren: Ameren Missouri serves ~1.2 million electric and ~110,000 gas customers; Labadie is Missouri's largest coal plant. en.wikipedia.org
- Wikipedia — Evergy: ~1.7 million electric customers across Kansas and Missouri; ~16,000 MW of capacity. en.wikipedia.org
- Associated Electric Cooperative (AECI) — six transmission member-owners, 51 distribution co-ops, ~2.1 million member-consumers across Missouri, Oklahoma, and Iowa. aeci.org
- Missouri Independent — Planned Ameren Missouri ~30-mile transmission line (Callaway/Montgomery counties) to connect with Grain Belt Express, targeted for 2029, Dec 15, 2025. missouriindependent.com
- Missouri Public Service Commission — regulator of Ameren Missouri, Evergy Missouri, Liberty/Empire, and Spire. psc.mo.gov
- Missouri Independent — Missouri braces for spike in energy costs: SB 4 signed by Gov. Kehoe April 2025, forward test year; Energy Innovation projects ~$640/yr higher bills by 2035, Oct 22, 2025. missouriindependent.com
