Ohio · Electric & Grid Utilities
Central Ohio is stacking a $20B chip fab and a data-center cluster onto one grid. Your capital plan is where that lands.
Intel's Licking County fab and a wall of data centers are driving load faster than Ohio has planned for in a generation, while PJM capacity prices spike and the HB6 bribery scandal has made every rider and rate case a fight. Each of those forces reshuffles the projects on your list. Invizion helps electric utilities re-sequence a capital portfolio in a click — and defend every decision.
The Ohio Landscape
Four forces are moving your project list at once
None of these is theoretical, and none of them waits for your next budget cycle. Together they mean the capital plan you approved last year may already be the wrong plan.
Demand — Load Growth
A chip fab, a data-center cluster, one grid
Intel is building a roughly $20 billion semiconductor fab on 926 acres in New Albany / Licking County, and it sits next to a data-center cluster that already includes Meta and a $600 million Google campus.1
All of it lands on AEP Ohio, which serves about 1.5 million customers across central, southern and northwestern Ohio.4 Every large new customer is a capacity commitment competing for the same capital and the same interconnection window.
Reliability — PJM Capacity
The capacity market is sounding the alarm
PJM's capacity auction cost jumped from about $2.2 billion to more than $16 billion — roughly an eightfold increase — and by December 2025 PJM could not procure 100% of the capacity it needs, with rolling blackouts flagged as possible in 2026.2
Ohio sits inside PJM, so those price signals and shortfall warnings land directly on Ohio bills and on the case for building faster.
Generation — The Transition
Nuclear, coal, and a subsidy era that just ended
Ohio's two nuclear plants — Davis-Besse at 894 MW5 and Perry at 1,256 MW, now owned by Vistra after its 2024 Energy Harbor acquisition6 — were the plants HB6 was written to bail out.
The state's OVEC coal plants were subsidized on customer bills too,7 until HB15 ended that charge in 2025 — four years after HB128 repealed the nuclear subsidy in 2021.8 The subsidy era is over; the capital decisions it distorted are not.
Capital — Defensibility
Every capital dollar has to survive the HB6 shadow
HB6 was worth about $1.3 billion to FirstEnergy and was secured with roughly $60 million in payments;3 the former House Speaker was sentenced to 20 years, and FirstEnergy paid $230 million to the DOJ (2021), $100 million to the SEC (2024) and $250.7 million in PUCO-ordered refunds and forfeitures (2025).8
The lasting effect on capital planning is scrutiny: in Ohio, no rider, no rate case, and no capital recovery is treated as a formality anymore.
Who Runs Ohio's Grid
Four investor-owned utilities, plus municipals and cooperatives
Ohio's grid is carried by four PUCO-regulated investor-owned utilities — AEP Ohio (whose parent, AEP, ran about $19.72 billion of 2024 revenue and $103.1 billion in assets9), FirstEnergy's three Ohio companies, Duke Energy Ohio and AES Ohio — alongside municipal systems and electric cooperatives. The pressures are shared; the accountability path differs.
Investor-owned utilities
Rates & capital recovery regulated by the PUCO
AEP Ohio's parent, American Electric Power, carried roughly $103.1 billion in assets in 2024 — a sense of the capital scale behind Ohio's largest electric footprint.9
Municipal power & cooperatives
Governed by boards & members, not PUCO rates
Rate-Setting & Oversight
Every capital dollar has to be defensible
Whether you answer to the Public Utilities Commission of Ohio or a municipal board, the question is the same — and after HB6, it is asked harder: why this project, why now, why at this cost?
- Public Utilities Commission of Ohio (PUCO) regulates the rates, capital recovery and Electric Security Plans of Ohio's investor-owned electric utilities.12
- The HB6 scandal — roughly $60 million to secure a $1.3 billion benefit — ended with former House Speaker Larry Householder convicted in 2023 and sentenced to 20 years.133
- FirstEnergy's penalties total $230 million to the DOJ (2021), $100 million to the SEC (2024) and $250.7 million in PUCO-ordered refunds and civil forfeitures (2025).8
- HB15 (2025) reset Ohio energy law — ending the OVEC coal-plant subsidy that HB6 imposed, four years after HB128 repealed the nuclear subsidy.8
- Capital scale: AEP Ohio's parent, AEP, ran about $19.72 billion of revenue in 2024 — Ohio rates help fund a multi-billion-dollar capital program.9
Dollars On The Table
The money is moving — can your plan absorb it?
Ohio's grid is caught between private capital flooding in, a capacity market repricing risk, and money flowing back to ratepayers from the scandal. The constraint is readiness: which projects are shovel-ready, and how the timing lines up.
- $20B Intel fab + $600M Google campus — private capital anchoring central-Ohio load and forcing utility grid investment to keep pace.1
- $16B+ PJM 2025 capacity auction — the market signal now pulling new generation and grid capital into the PJM footprint that includes Ohio.2
- $250.7M in PUCO-ordered FirstEnergy refunds and forfeitures (2025) — money moving back toward ratepayers as the HB6 accounts are settled.8
- HB15 (2025) ended the OVEC coal subsidy — removing a charge Ohio customers had carried on their bills for years.8
- IRA direct-pay tax credits put utility-scale storage and clean generation in reach for Ohio's municipals and cooperatives, such as AMP and Buckeye Power, that cannot use traditional tax equity.
Where Invizion Fits
Turn Ohio's grid build-out into a defensible capital plan
Invizion is scenario-based capital portfolio optimization built for utilities. When load forecasts jump, a grant lands, or a retirement date moves, you don't re-plan by hand for weeks — you model it and decide with a record to stand behind.
Model the “what-if” before it's forced on you
A data-center interconnect, a delayed transmission line, a moved retirement date — build the scenario and see the impact on the whole portfolio, side by side with today's plan.
Re-sequence 500 projects in a click
When priorities move, Invizion re-orders the portfolio automatically — accelerating, stretching, or deferring projects against the constraints you set, not weeks of spreadsheet surgery.
Give regulators or your board a defensible record
Every prioritization and trade-off is captured. When you're asked “why this project, why now,” the answer is documented — not reconstructed after the fact.
Ohio's Grid, In Brief
Questions Ohio utility leaders are asking
Short, sourced answers — the same facts we dig into with utilities looking at their capital programs.
What is driving Ohio's electricity demand?
Why are Ohio capacity costs rising so fast?
What happened with HB6 and the FirstEnergy scandal?
What did HB15 change in 2025?
What is happening to Ohio's nuclear plants?
How does Invizion help Ohio electric utilities plan capital?
Go Deeper
Related from Invizion
Explore Further
See how utilities keep capital plans defensible
Invizion helps utilities model, optimize, and defend their capital programs. Explore how it works, or read our latest thinking on capital planning across the utility sector.
Explore InvizionThis briefing was last reviewed September 2026.
Sources
- Wikipedia — Intel's ~$20B semiconductor fab on 926 acres in New Albany / Licking County; Meta (2020) and a $600M Google data center in New Albany. en.wikipedia.org
- Wikipedia — PJM Interconnection: 2024 capacity auction cost ~$2.2B; 2025 auction exceeded $16B (about an eightfold increase); December 2025 capacity shortfall with rolling blackouts flagged for 2026. en.wikipedia.org
- Wikipedia — FirstEnergy: Ohio operating companies Ohio Edison, The Illuminating Company (CEI) and Toledo Edison; ~$60M funneled to secure HB6, worth ~$1.3B to the company; $230M DOJ penalty. en.wikipedia.org
- Wikipedia — AEP Ohio serves about 1.5 million customers in central, southern and northwestern Ohio. en.wikipedia.org
- Wikipedia — Davis-Besse Nuclear Power Station: 894 MW nameplate, operated by Vistra. en.wikipedia.org
- Wikipedia — Perry Nuclear Generating Station: 1,256 MW nameplate, owned by Vistra, which completed its acquisition of Energy Harbor in March 2024. en.wikipedia.org
- Wikipedia — Ohio Valley Electric Corporation operates the Kyger Creek (OH) and Clifty Creek (IN) coal plants whose costs Ohio customers subsidized under HB6. en.wikipedia.org
- Wikipedia — Ohio nuclear bribery scandal (HB6): ~$60M via Generation Now; Larry Householder convicted (2023, 20-year sentence); FirstEnergy paid $230M (DOJ, 2021), $100M (SEC, 2024) and $250.7M in PUCO-ordered refunds and forfeitures (2025); HB128 repealed the nuclear subsidy (2021) and HB15 ended the OVEC coal subsidy (2025). en.wikipedia.org
- Wikipedia — American Electric Power (AEP Ohio's parent): ~$19.72B operating revenue and ~$103.1B total assets in 2024. en.wikipedia.org
- Wikipedia — Duke Energy Ohio (formerly Cincinnati Gas & Electric, via Cinergy) serves the Cincinnati / southwest Ohio area. en.wikipedia.org
- Wikipedia — American Municipal Power (AMP), a Columbus-based nonprofit, supplies wholesale power to member municipal electric systems across Ohio. en.wikipedia.org
- Wikipedia — Public Utilities Commission of Ohio regulates the rates, capital recovery and Electric Security Plans of Ohio's investor-owned electric utilities. en.wikipedia.org
- Wikipedia — Larry Householder, former Ohio House Speaker, convicted in 2023 and sentenced to 20 years for the HB6 racketeering scheme. en.wikipedia.org