Wyoming · Electric & Grid Utilities
Wyoming generates far more power than it uses. Your capital plan is where coal politics and the export build collide.
Wyoming produces more than twice the electricity it consumes and ships the rest across the West, even as state law fights to keep coal units running and PacifiCorp's plan retires them.1 Add a $4 billion advanced reactor, thousands of megawatts of new wind, and multi-state transmission, and every force pulls the project list a different way. Invizion helps electric utilities re-sequence a capital portfolio in a click — and defend every decision.
The Wyoming Landscape
Four forces are moving your project list at once
None of these is theoretical, and none of them waits for your next budget cycle. In Wyoming they pull in opposite directions — keep coal, build wind, add nuclear, export it all — and the capital plan is where they have to reconcile.
Demand — An Export Grid
Built to sell power out of state
Wyoming generated about 40.7 million MWh in 2024 but consumed only 17.2 million MWh at retail — it is an exporter first, shipping well over half its output to other Western states.1
The growth story is transmission and generation to serve that outside demand: the 728-mile, 3,000 MW TransWest Express HVDC line from Rawlins to the Southwest, paired with the Chokecherry & Sierra Madre wind complex, plus PacifiCorp's Energy Gateway segments.102 Every export commitment is a capacity and capital commitment competing for the same dollars.
Reliability — Thinning Margins
The West's cushion is speculative
WECC's 2025 assessment warns the Western Interconnection could face energy shortfalls as early as 2028, with loss-of-load hours from 2029 even if every planned resource lands on time.5
In the Basin subregion that includes Wyoming, roughly 80% of planned additions are still “speculative,” so the reliability margin depends on projects actually getting built — and on an aging coal fleet staying available while the replacements clear the queue.5
Generation — Coal Politics vs. the IRP
The state wants coal kept; the plan retires it
Wyoming is the nation's largest coal producer, supplying roughly 40% of U.S. coal, and its politics reflect it.6 A 2020 law pushes utilities to study and pursue carbon capture to keep coal units running — Rocky Mountain Power has proposed CCUS on Jim Bridger units 3 and 4 rather than converting them to gas.7
Yet PacifiCorp's own plan points the other way for Jim Bridger (1,413 MW), Naughton, Dave Johnston (762 MW) and Wyodak, while TerraPower's ~$4 billion Natrium reactor rises at the retiring Kemmerer coal site.83 Which future you fund changes the whole portfolio.
Capital — Transmission & Hardening
Billions in lines, on top of the backlog
Rocky Mountain Power's 2024 rate case is driven by new build: the Rock Creek I and II wind farms and the Gateway South and Gateway West Segment D.1 transmission lines, plus rising wildfire-insurance costs.4
On the private side, TransWest Express (~$3 billion) and Chokecherry & Sierra Madre (~$5 billion) are moving toward completion.102 New obligations don't replace the backlog — they stack on it, and something on the list has to move.
Who Runs Wyoming's Grid
One dominant IOU, a second utility, and a web of coops and municipals
Wyoming's retail grid is led by PacifiCorp's Rocky Mountain Power, with Black Hills Energy in the southeast, alongside generation-and-transmission cooperatives and municipal systems. The pressures are shared; the accountability path differs.
Investor-owned utilities
Rates & capital recovery regulated by the Wyoming PSC
Rocky Mountain Power's 2024 Wyoming rate case sought a 14.7% increase, roughly $17 more per month for a typical customer.4
Cooperatives & public power
Governed by boards & members, not PSC rates
Wyoming's installed wind capacity has climbed past roughly 2,700 MW and keeps growing as export projects advance.14
Rate-Setting & Oversight
Every capital dollar has to be defensible
Whether you answer to the Public Service Commission or a cooperative board, the question is the same: why this project, why now, why at this cost — and, in Wyoming, why coal or why not.
- Wyoming Public Service Commission (WPSC) regulates rates, capital recovery, and resource planning for investor-owned utilities such as Rocky Mountain Power and Black Hills Energy.15
- Rocky Mountain Power's 2024 rate case sought a 14.7% increase (about $17 per month for a typical customer), filed August 2024 for a June 2025 effective date — its third ask in roughly a year, so approvals are not a formality.4
- Coal-preservation law: a 2020 statute pushes utilities to study and pursue carbon capture to keep coal units operating, shaping how retirements and CCUS retrofits (like Jim Bridger units 3 and 4) land in front of the Commission.7
- Cooperatives & municipals such as Basin Electric members and the Wyoming Municipal Power Agency set rates through boards — capital decisions made in front of their members, not the PSC.12
Capital On The Table
The money is moving — can your plan absorb it?
Wyoming has more grid and generation capital in flight than in a generation, much of it private and export-driven. The constraint is readiness: which projects qualify, which are shovel-ready, and how the timing lines up.
- TransWest Express: ~$3 billion for a 728-mile, 3,000 MW ±600 kV HVDC line moving Wyoming wind from Rawlins to the Desert Southwest.10
- Chokecherry & Sierra Madre: ~$5 billion for up to 3,000 MW of wind (about 1,000 turbines) developed by the Power Company of Wyoming.2
- TerraPower Natrium: ~$4 billion for the 345—500 MWe reactor at Kemmerer, with the U.S. DOE's Advanced Reactor Demonstration Program funding roughly half; non-nuclear construction began in 2024 and NRC issued the construction permit in 2026.39
- Rocky Mountain Power's Rock Creek I & II wind and Gateway transmission are the utility-side capital now flowing into rates — the drivers behind the 2024 rate case.4
- IRA transferable and direct-pay tax credits put utility-scale wind, storage, and nuclear within closer reach for Wyoming's cooperatives and municipal systems.
Where Invizion Fits
Turn Wyoming's grid build-out into a defensible capital plan
Invizion is scenario-based capital portfolio optimization built for utilities. When load forecasts jump, a grant lands, or a retirement date moves, you don't re-plan by hand for weeks — you model it and decide with a record to stand behind.
Model the “what-if” before it's forced on you
A data-center interconnect, a delayed transmission line, a moved retirement date — build the scenario and see the impact on the whole portfolio, side by side with today's plan.
Re-sequence 500 projects in a click
When priorities move, Invizion re-orders the portfolio automatically — accelerating, stretching, or deferring projects against the constraints you set, not weeks of spreadsheet surgery.
Give regulators or your board a defensible record
Every prioritization and trade-off is captured. When you're asked “why this project, why now,” the answer is documented — not reconstructed after the fact.
Wyoming's Grid, In Brief
Questions Wyoming utility leaders are asking
Short, sourced answers — the same facts we dig into with utilities looking at their capital programs.
Does Wyoming use all the electricity it generates?
Is Wyoming keeping its coal plants or retiring them?
What is the Natrium reactor at Kemmerer?
Who regulates my Wyoming utility's rates?
Can the Western grid keep up?
How does Invizion help Wyoming electric utilities plan capital?
Go Deeper
Related from Invizion
Explore Further
See how utilities keep capital plans defensible
Invizion helps utilities model, optimize, and defend their capital programs. Explore how it works, or read our latest thinking on capital planning across the utility sector.
Explore InvizionThis briefing was last reviewed September 2026.
Sources
- U.S. Energy Information Administration — Wyoming Electricity Profile 2024 (net generation 40,709,150 MWh; retail sales 17,216,901 MWh; avg. price 9.14¢/kWh). www.eia.gov
- Chokecherry and Sierra Madre Wind Energy Project (Power Company of Wyoming) — up to ~3,000 MW, ~1,000 turbines, ~$5B. en.wikipedia.org
- Kemmerer Power Station / Natrium demonstration — 345—500 MWe, non-nuclear construction began June 2024, NRC construction permit March 2026. en.wikipedia.org
- Wyoming Public Media — Rocky Mountain Power's 14.7% Wyoming rate request (~$17/mo), filed Aug. 2024, effective June 2025; Rock Creek wind and Gateway transmission, Aug. 6, 2024. www.wyomingpublicmedia.org
- WECC 2025 Western Assessment of Resource Adequacy — possible Western shortfalls by 2028; ~80% of Basin subregion additions speculative. feature.wecc.org
- Coal in Wyoming — largest U.S. coal-producing state since 1986, roughly 40% of national output. en.wikipedia.org
- Wyoming Public Media — carbon capture proposed for Jim Bridger units 3 & 4; 2020 Wyoming CCUS law; RMP serves ~144,000 Wyoming customers, Apr. 3, 2024. www.wyomingpublicmedia.org
- PacifiCorp — Wyoming coal capacities: Jim Bridger 1,413 MW, Dave Johnston 762 MW, Naughton 357 MW (coal), Wyodak 268 MW. en.wikipedia.org
- TerraPower — Natrium project ~$4B total, U.S. DOE Advanced Reactor Demonstration Program funding roughly half. en.wikipedia.org
- TransWest Express — 728-mile, 3,000 MW ±600 kV HVDC line, ~$3B, Rawlins, WY to the Desert Southwest. en.wikipedia.org
- Black Hills Energy — Cheyenne Light, Fuel & Power serves ~80,000 customers in Cheyenne and southeastern Wyoming. en.wikipedia.org
- Basin Electric Power Cooperative — Wyoming members include Powder River Energy Corporation and the Wyoming Municipal Power Agency. en.wikipedia.org
- Rocky Mountain Power (PacifiCorp) — Wyoming service territory: Casper, Cody, Laramie, Rock Springs, Kemmerer and more. en.wikipedia.org
- Wind power in Wyoming — installed wind capacity past ~2,700 MW and rising as export projects advance. en.wikipedia.org
- Wyoming Public Service Commission — rates, capital recovery, and resource-plan oversight for investor-owned electric utilities. psc.wyo.gov